• Plan for construction of wind turbine to generate power for aluminium foundry
  • Power: 3-4.5 MW (IEC class 3)
  • Energy production: 14,000,000 KWh/year
  • Saving CO2 emissions: 7850 tonnes/year

ENVIRONMENTALLY FRIENDLY ALUMINIUM MELTING WITH WIND ENERGY

Where will the wind turbine be located?

  • On the site of E-MAX’s aluminium smelter, Minervastraat 1, Kerkrade
  • Large distance from residential areas
  • Research shows that laws and regulations can be met
  • Secure location

Do you have questions or want more information? Please mail to [email protected]

E-MAX GOES FOR SUSTAINABLE

  • E-MAX has been manufacturing X-ECO for more than 13 years
  • X-ECO consists of up to 80% used aluminium
  • X- ECO is not only super durable, but also very high-quality aluminium
  • In addition to the product, the production process is also designed for sustainability
  • Generating electricity from wind makes the process even more sustainable

CURRENT SITUATION

  • Environmental study: completed
  • Permit application: mid-March 2021
  • Grant of permit: expected in August 2021
  • Start of construction: mid-2022
  • Commissioning of wind turbine: mid-2023
E-MAX GOES FOR SUSTAINABLE

ENVIRONMENTAL PARTICIPATION

  • E-MAX stands for an open and transparent process
  • Impacts on surroundings are reduced where possible
  • Explore options for financial participation:
    • Annual contribution to environment fund (approx. 0.50 €/MWh)
    • Trade Green Certificates with nearby companies to contribute to their sustainability efforts
    • Issue bonds to allow nearby businesses and residents to participate
ENVIRONMENTAL PARTICIPATION